EICR testing for universities & colleges.
Separate teaching-building access from research and specialist electrical systems.

Arrange EICR testing
around your universities & colleges.
Campus electrical testing needs an installation map that reflects how the estate actually operates. Lecture buildings, laboratories, libraries and workshops may share services while their authorised work windows differ. Collect board schedules, previous reports and the technical contacts responsible for each building. Identify research equipment, sensitive supplies and systems that fall under specialist procedures before agreeing the inspection boundary. A summer teaching break does not necessarily stop research, conferences or residence use. Plan safe interruption and restoration with the relevant departments, then report completion and exceptions by campus and building. This keeps a coordinated programme useful to central estates staff without concealing local limitations or passing specialist equipment assumptions into a general installation report.
Know what the
service covers.
Inspection and testing of fixed electrical installations in commercial buildings. Agree the circuits, access and shutdowns before the visit, then receive an Electrical Installation Condition Report.
View the complete EICR testing serviceAgree how the findings
reach your team.
- Use building, distribution-board and circuit references that your team can locate.
- Keep the agreed inspection extent, limitations and uncompleted areas with the EICR.
- Name the recipient for urgent findings and retain records of separately authorised follow-up work.
Questions before you book
Can laboratory circuits be treated like office circuits?
Identify the installation and equipment involved first. Specialist features may require additional competence or procedures beyond an ordinary office scope.
What should central estates receive?
Ask for building-level reports, identifiable limitations and a consolidated exception list using the campus’s own references.
Tell us about
the premises.
Separate ordinary building and appliance inspections from specialist laboratory, medical and research equipment maintenance.
Planning references
- Home Office: Educational premises fire-risk assessment ↗England landing-page scope
- Home Office: Sleeping accommodation fire-risk assessment ↗England landing-page scope
- HSE: Using contractors (INDG368) ↗Great Britain
Request EICR testing.
Start with the work required. Add your premises, access and preferred dates in the enquiry.
Prefer to call? 0203 885 2299Useful inspection guides.
Building an EICR programme around risk, access and decisions
Build the programme from verified inspection records, site responsibilities and operational constraints.
GUIDE · 4 MIN READHow to plan a commercial EICR without losing control of the working day
Plan a commercial EICR with clear scope, useful records, realistic isolation windows and named owners for access, findings and follow-up.
GUIDE · 4 MIN READThe commercial inspection site readiness checklist
Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.
Request EICR testing
for your premises.
Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.
