What affects a commercial EICR quotation?
The main factors are the installation’s scale and complexity, circuit identification, condition, access, required isolations and the agreed reporting scope. Out-of-hours work, specialist coordination and unresolved records can add work. Compare quotations using the same boundaries and assumptions; a low total is difficult to judge if it buys a narrower assessment.
The inspection team needs to identify what is there, reach it safely, carry out suitable work and produce traceable records. Each of those tasks can vary considerably between commercial premises. This article explains the practical factors behind a quotation so facilities and procurement teams can compare offers intelligently. It does not give invented market prices or suggest that the cheapest or most expensive quotation is automatically the right one.
In this article 5 sections
Scale is more than floor area
Circuit numbers, distribution structure and the types of loads matter. A large open office may have relatively straightforward distribution; a smaller workshop may have several boards, three-phase equipment and varied operating conditions. Floor area or employee count alone does not show the electrical work involved.
Provide existing board schedules and diagrams, with any uncertainty identified. Ask how submains, spare ways and three-phase circuits are counted. A quotation based on a clear provisional inventory is easier to manage than a price attached to an unexplained total. The final report should make the assessed boards and circuits traceable.
Identification and records affect preparation
Accurate schedules and previous reports help the contractor plan and understand the installation. Missing, outdated or incorrect information may require more identification and checking. That is not merely paperwork: an incorrectly described circuit can change the interruption plan and make safe access more complicated.
In a hypothetical business unit, a board schedule still describes the previous occupier’s rooms after a major fit-out. The number of circuits may be familiar, but their loads and locations need confirmation. Tell bidders about that condition and ask whether identification and schedule corrections are included, provisional or separately priced.
Access and interruption affect the work window
Boards behind storage, locked plant rooms, restricted areas and occupied workspaces can slow or prevent work. The available isolation windows matter too. A team with a properly planned evening shutdown may achieve more than a team repeatedly waiting during trading hours for permission to interrupt one circuit.
Out-of-hours attendance may involve additional staffing, security, specialist support or different working arrangements. Ask for those assumptions to be stated. An apparently cheaper daytime offer may leave more operational limitations, while an evening offer may still be unsuitable if nobody can shut down or restart critical equipment.
Scope determines the evidence being bought
Compare included buildings, supplies, boards, inspection extent, testing and recorded limitations. Ask about sampling and the method for extending work if findings warrant it. A proposal that excludes a difficult area is not directly comparable with one that plans access to assess it.
Also check the deliverables: full report, schedules, observation detail and any agreed review meeting. Remedial work is a separate scope unless expressly included. Keep survey costs, reporting, urgent make-safe arrangements and later repairs intelligible. A single package price can be reasonable, but you should still understand what triggers additional work.
Compare quotations with a common brief
Send each bidder the same information pack and ask them to identify assumptions. Use a comparison sheet that shows scope, access, interruptions, records, deliverables and variation handling alongside price. Where a bidder proposes a different method, ask how it meets the site’s purpose and what limitations remain.
The aim is a price you can defend because the work is understood. Avoid asking a contractor to remove meaningful assessment simply to match a lower figure whose scope has not been checked.
Ask bidders to mark whether each assumption is confirmed, provisional or dependent on a site survey. That distinction makes uncertainty visible without requiring an invented contingency figure. If two offers differ substantially, use the comparison sheet to locate the difference before negotiating the total. It may concern circuit identification, evening support, omitted supplies or the evidence included rather than the price of identical work.
| Comparison item | Useful written answer |
|---|---|
| Boundary | Named supplies, buildings and boards. |
| Access | Working windows, escorts and known restrictions. |
| Uncertainty | Provisional counts and identification assumptions. |
| Evidence | Full report, schedules and agreed explanation. |
| Variations | What changes scope and how the decision is recorded. |
- All bidders use the same installation boundary and circuit information.
- Circuit-counting conventions and uncertain entries are explained.
- Access, shutdown windows and specialist support are costed consistently.
- Sampling and limitations are described rather than hidden in headings.
- Reporting, identification work and return visits have clear treatment.
- Additional findings have a defined authorisation and pricing process.
EICR testing questions.
Can you estimate cost from a previous invoice?
It can provide context, but changes to the installation, access, scope and working conditions may make it a poor comparison. Supply the current information and ask for explicit assumptions.
Are remedial repairs usually part of the EICR?
Do not assume they are. Inspection reports condition; repairs need a clear agreed scope, appropriate authority and suitable completion evidence.
Find the relevant service details, access considerations and information to include in an enquiry.
Find inspection advice for your industry →Find your site area →Prepare a site inspection list →Sources used for this article.
The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.
- IET: BS 7671:2018+A4:2026 EICR model forms ↗
Primary report structure, extent and limitations, observations, circuit details, test results and recipient guidance. The article explains the form without reproducing it.
- HSE HSG85: Electricity at work, safe working practices ↗
Supports planning, competence, safe systems of work, isolation and control of work on electrical systems.
EICR testing: scope & records.
See what the service includes and which site details help prepare a relevant quote.
View the service details